What a solar export limit is

A solar export limit is a cap, in kilowatts, on how much power your house can send to the street at any one moment. Your lines company, which owns the poles and wires on your street, sets it, not us. The only cost of a cap is the power it holds back, which would have earned that half-hour's spot price (the wholesale price for that half hour). If your system is 10 kW or less, rules in force since 11 May 2026 give your installer a route where the cap can't usually go below 10 kW, so it holds nothing back.

Illustration: a house with solar panels beside a bar showing a roof making 12 kW: 1 kW used at home, 8 kW exported up to the export limit line, and 3 kW held back above it. Roof making 12 kW 3 kW held back 8 kW limit 8 kW exported 1 kW used at home

What is an export limit?

On a sunny day your roof can make more power than your house is using. Your inverter, the box that turns the panels' power into household power, sends the extra out to the street. The export limit is the most it is allowed to send at any one moment, in kilowatts. It is not a monthly allowance of units, and it is not the price you are paid for a unit.

If we install your system, we lodge the application in your name and tell you what comes back. We don't choose the number.

Where the rules come from

The rules sit in the Electricity Industry Participation Code. The Electricity Authority, the industry's government regulator, writes it, and every lines company must follow it. A change that took effect on 11 May 2026 put a floor under export limits for smaller systems on one of the application routes, explained below. Clause numbers are in the fold-out at the bottom.

Which route your system takes

The Code gives your installer three application routes, named Part 1, Part 1A and Part 2, set by the system's size. Size here means nameplate capacity: the lower of the panels' rating and the inverter's rating. Part 1 is for 10 kW or less. Part 1A is a newer route for the same size, open when the system meets the Code's inverter and installation conditions. Part 2 is for anything over 10 kW. If your system is 10 kW or less, ask your installer whether it can go on Part 1A.

On the Part 1A route your lines company may set an export cap, but not below 10 kW unless a network study, an engineering check of that part of the network, shows a lower cap is needed to keep the voltage on your street in range or the network safe. Part 1A systems are 10 kW or less and the cap is at least 10 kW, so the roof cannot outrun the cap unless that study has lowered it. On Part 1 or Part 2 the rules set no minimum, so your cap is whatever your approval says.

Does the limit change what you are paid?

It doesn't change the price. On our plan each unit the meter records as exported earns the half-hourly spot price, uncapped: the wholesale price for the half hour it left your house.

Our fee is never charged on what you export. The import side of the bill, the power you buy from the grid, has network losses, lines and transmission charges, metering, levies, our fee and GST, and the wholesale price can spike for weeks with little or no warning.

I'm not putting a dollar figure on a year of exports. It depends on your roof, your cap and the half hour. Export prices can be low at sunny middays.

The picture at the top shows how a cap bites. Say you have a bigger Part 2 system and the lines company has chosen an 8 kW cap. The roof is making 12 kW and the house is using 1 kW. Then 3 kW is held back. That 8 kW is not the 10 kW floor, which does not apply to Part 2. Held back at the inverter, those kilowatts earn nothing.

Where to find your own cap

Your number is on your network approval, and in your inverter's export setting.

On the Part 1A route, a cap under 10 kW has to rest on a published network study. From 11 November 2026 that study must also follow an assessment method the Code sets out. Until you have seen your own approval, don't assume the cap is 10 kW.

The fit check on the electricity page shows whether a spot plan suits how you use power. A battery, to keep the surplus for later, is on our solar page.

Using what the cap holds back

Run the washing or the hot water while the roof is ahead of the house. A battery can hold the rest for later. If you want the hours chosen for you, Home Assistant can read the forecast from our price API. The API publishes prices and switches nothing, so a relay (the switch that turns a hot water cylinder or charger on and off) is still a licensed electrician's job.

Export limit questions

Does an export limit change the price of the units I export?

No. Each unit the meter records as exported earns the half-hourly spot price, uncapped.

Can I ask for a higher limit?

You can ask your installer or your lines company. They hold the approval, and any cap is a condition of it. Whether they raise it is up to them.

How I worked this out

This is the detail behind the post, with the clause numbers, for anyone who wants to check it. The Code text is the Electricity Industry Participation Code 2010, the consolidation whose file is dated 1 July 2026. Part 6 pages in that file print 11 May 2026. Clause 6.3A was inserted on 11 May 2026 by the Electricity Industry Participation Code (Export Limits) Amendment 2026. I read it in that PDF: the definition of nameplate capacity and of maximum export power in clause 1.1, and clause 6.3A with Schedule 6.1.

Nameplate capacity means the lesser of the full-load continuous rating of the generating plant and the full-load continuous rating of its inverter, under the conditions the designer specifies.

Maximum export power means the maximum active power exported into the local network or embedded network at a connection, equal to the nameplate capacity minus the minimum load at the connection, or the power export limit imposed by an active export control device.

Clause 6.3A(1) says a distributor must not set a limit on the nameplate capacity installed at a connection for an application under Part 1 or Part 1A. Clause 6.3A(2) says that for a Part 1A application they may set a maximum export power threshold, not lower than 10 kW unless subclause (3) applies. Subclause (3) allows a lower threshold only after a network study that shows it is needed for voltage or network safety, including thermal constraints, counting generation already connected or being assessed on that section of network. A dynamic or flexible limit may sit lower only in the periods the study names, and must not operate when the network is not constrained. Clause 6.3A(4): from 11 November 2026, a study under (3) has to use the export limits assessment methodology. Clause 6.3A(5) has applied since 11 May 2026: the lines company publishes any such study and a list or map of the areas where the lower threshold applies, and repeats the study when a change on the network is likely to alter its result.

Schedule 6.1: Part 1 applies to nameplate capacity of 10 kW or less unless you elect Part 1A. Part 1A is that election, for a system designed and installed to the installation standard the Code names (AS/NZS 4777.1:2024), with an inverter certified to AS/NZS 4777.2, that will inject at or under the threshold. Part 2 is nameplate capacity of more than 10 kW. Clause 6.3(2) says each lines company publishes its connection standards, and where it has set a threshold, the threshold and the method behind it.

The worked example is arithmetic only, and it is a Part 2 system: 12 kW from the roof, so the nameplate is over 10 kW when the inverter is at least that large. The lines company has chosen an 8 kW cap. It is not the 10 kW floor. Minus 1 kW used in the house, that leaves 3 kW held back. It is not a measured house and not a price. Our solar installation terms (version 5, issued 1 November 2026, clause 4.1) say we tell you if the network company imposes an export limit when we install. What you are paid per exported unit is the half-hourly spot price, uncapped, which is the electricity plan, not the installation contract.

Get in touch

Talk to us

Questions about electricity or solar? Send us a message and we'll get back to you, usually within one business day.

Phone hours

Monday – Friday
9 am – 5 pm
Saturday
Closed
Sunday
Closed

Your ICP is the 15-character number on your power bill.